Don't Scarfer now! next launch in...
Days
Hours
Minutes
Seconds
Free UK shipping when you spend over £60

Abbreviations

A, B, C  Yarn Colours ie “Using Col A”

Approx  Approximately

Beg  Begin(ning)

C4B  Cable 4 (or number stated) stitches at the back

C4F  Cable 4 (or number stated) stitches at the front

CM  Centimeter(s)

Cont  Continue

Inc  Increase

K  knit

K2tog  Knit two stitches together

LH  Left hand (needle)

M1 Make One

P  Purl

P2tog  Purl two stitches together

Patt  Pattern

Rem  Remaining

Rep  Repeat

RH  Right Hand (needle)

RS  Right Side of knitting

SL  Slip

SKPO  Slip one stitch, knit one stitch, pass the slipped stitch over the knitted stitch

SSK  Slip one stitch, Slip one stitch, knit slipped stitches together

 St St  Stockinette Stitch (1 row knit, 1 row purl)

St(s)  Stitches

Tog  Together

WS  Wrong side of knitting

Tension and Gauge

Pick Up & Knit

Increasing

Skill level:Easy

"DPN"

Double Pointed Needles

Skill level:Advanced

Decreasing

Colourwork

Skill level:Advanced

Circular Needles

Skill level:Intermediate

"CO"

Casting On & Off

Skill level:Easy

Cables

Skill level:Advanced

Blocking

Skill level:Easy

Mattress Stitch